Month: December 2023

Heater YD-30 for Australia

Heater Layout YD-30 for Australia Melbourne client. Items/Model YD-30 Burning Rate (kgs/Hour). 30 kgs/Hr. Feed Ability (kgs). 60 kgs. Tools Weight. 2300 kgs. Main Chamber (Liters). 360. 2nd Chamber (Liters). 200. Outdoors Dimensions (cm). 145x90x175. Inside Measurements (centimeters). 100x60x60. Oil Tank( Liters). 200. Door Opening (centimeters). 48 x 60. Smokeshaft (M). 5. Chimney Kind. Stainless-steel. …

China promises control as infection expands

news from: http://www.chinadaily.com.cn/a/202002/01/WS5e347a86a310128217273ead.html  THAT proclaims break out makes up global public wellness emergency China guaranteed on Friday to work with the worldwide community to support regional as well as also international wellness safety, and also repeated it has the positive self-image as well as additionally capability to win the fight versus the one-of-a-kind coronavirus epidemic, which …

Wuhan virus: China mobilises medical groups to fight new coronavirus

News from: https://www.thestar.com.my/news/nation/2020/01/26/wuhan-virus-china-mobilises-medical-teams-to-fight-new-coronavirus  WUHAN (Bernama): China is mobilising medical staff to aid Wuhan, the centre of the novel coronavirus (2019-nCoV) outbreak, as the country reported 830 confirmed cases of pneumonia, caused by the virus and 25 deaths by the end of Thursday (Jan 23). By Thursday midnight, Hubei Province in central China reported 549 cumulative confirmed …

medical waste

———————————–   Failure to establish the authenticity of the certificate the bidder is liable to render the bid non-responsive and bidder open to action in the line with applicable regulations and act. Original catalogue must be submitted Original data sheet must be submitted Lot-B Solidifier (Fluid waste disposal Product)   Liquid Waste Solidifier for Water …

50kgs per hour burner with 2 chambers vendors from china

50kgs per hour incinerator with two chambers suppliers from china *Aveage 50kgs per hour *Double chamber and double burner *900liters primary combustion chamber *Italy burner *Stainless steel chimney Variation YD-50 Burning Cost Average 50 kgs/hour Feed Ability Typical 150 kgs Primary Burning Chamber 900 Litres Added Combustion Chamber 300 Litres Mix Burning Chamber Yes Smoke …

30kgs medical waste heater Design TS30 PLC .

30kgs per hour(average) medical waste incinerator, design dual  combustion chambers(primary chamber and secondary chamber),  smoke filter chamber, PLC auto. control system, 0.33m3(330liters) primary combustion chamber, italy oil or gas fuel burner. for small  hospital medical waste treatment. Buy waste incinerator, find hiclover Items/Model TS30 PLC Idea Waste Incineration Burn Rate Criterion 30kgs/hour Gas Kind Diesel Oil/Natural …

00 BEDS HOSPITAL INCENERATOR TECHNICAL INFORMATIONS

1) Policy – Waste disposal management shall be taken special note to prevent hospital infection. – Infections wastes shall be managed, stored strictly and burned by a incinerator located at hospital site.   2) Waste Disposal Plan a)Classification – Medical wastes in hospital are classified as follows;   Infections Waste Specially-controlled waste Organ, needle, etc. Industrial waste …

small incinerators

The incinerator shall be equipped with water injection nozzle connection. If the temperature in the primary chamber should rise too high (normal temperature between 300 and 800?C) during the operating time, the automatic water injection shall be activated to decease the temperature.   The incinerator shall have the following features and facilities:-   a-    Fuel …

animal incinerator for sale

The incinerator shall be provided with a range of interconnecting ductwork between the thermal reactor outlet and the inlet of the chimney. This ductwork shall consist of refractory lined tubes and high temperature resistant tubes made from rolled sheet steel of minimum 3mm thickness, welded along the length.   The standard chimney shall be made …

incinerator manufacturer

“PYROLYTIC” combustion, by controlling the gasification of waste The incinerator manufacturer must avoid the release of black smoke and fine dust, during the loadings. It shall be able to reduce the volume of wastes by 98%. It shall be able to hold emission in the second burn with gas residence of not less than 2 …

medical waste furnace

The incinerator to be fully assembled wired and logic function tested in the factory, prior to dispatch.   –      One high flue gas temperature indicator/alarm to provide an audio/visual warning in the event of high flue gas temperatures occurring in two stages:-   First stage audible alarm, second stage incinerator shutdown, with one voltage free …

Common 10kgs per human resources burner for small health care facility

This equipment quality structural for kinds of site, like hospital, environmental department,  animal cremation agencies, etc.  HICLOVER Incinerator supply updated models with dual combustion chamber,  mix-combustion chamber and smoke filter  chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C. Tools Technical Specifications Version YD-10C Image Feed Capability Common 40 kgs …

Family Pet Crematory with Movable system & & & & Auto. Door & & Independent Placement

Incinerator Model A1500, Intro This design is big-scale pet cremation tools for huge pets. Construction is dual/double combustion chamber with 03 units oil/gas burner,  batch load incineration equipment. Animal feed chamber is 1500Liters (Model: A1500).  Primary & Secondary combustion chambers and included mix-combustion chamber,  smoke filter chamber with firebrick and Refractory Concrete chamber. Batch load …

Pet crematorium as high as 200KG/day

Animal Crematory Burner Ability: Normal 80kgs per feeding Thing Spec Layout A900 Interior Measurements 120 x 90 x 85 CM Match for Family Pet Feline – – – – yes – Family pet – yes Pig – – small Cow – – no Key Product Checklist Key Burning Chamber Additional Burning Chamber Mix-Combustion Chamber Smoke …

Burning ability 50kg/hr with damp scrubber with dual released heater

This model is small-scale waste incineration equipment for small waste output.  Construction is dual/double combustion chamber with 02 units oil/gas burner.  Waste feed chamber is around 900Liters (0.9m3, YD-50). Primary & Secondary  combustion chambers and included mix-combustion chamber. Waste load on the  bottom of chamber. Incinerator panel control suit for local operation. Design YD-50 with …

Secure Payments

We accepet Paypal payment online

Fixed Price after payment

The price is fixed after you payment

Delivery on EXW Factory Term

We delivery on EXW Factory Term. Shipping term is separated
BCEPE.COM