Author: bcepe

incinerator capacity calculation

Test shall be conducted by factory authorized representative of incinerator manufacturer.   Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’s predicted burning period, inspect and weigh the residue.   Emissions testing may be deleted if not required by state or local …

incinerators manufacturers china

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering strainers shall be provided together with a lockable by-pass across both strainer and meter. The meter shall …

medcial incinerator manufacturer

The successful Bidder shall inform CEB in writing at least three (3) weeks prior to the carrying out of factory tests so as to enable sending of one CEB Engineer for witnessing  of  the  factory  tests.    A  ‘Factory  Acceptance  Test ’  schedule  shall  be   mutually agreed between the successful Bidder and the CEB Engineer. …

Hiclover bio waste incineration

HICLOVER now offer a full range of containerized incineration systems, placing us at the forefront of the latest transportation and industrial trends. Containerization enables immediate waste management as the units are pre-assembled and pre-installed.Containerization is the most feasible and viable option in contrast to the construction of on-site facilities and housing structures, eliminating the man power and costs involved. The system has the added benefit of total mobility (both local and international), and is ideal for military and civil camps and remote locations where infrastructure is scarce. ※ Main Quality:— — — — — Dual Burning Chamber — — Dual Italy Burner – – Burning Cost: 10-100kgs per hr–– – – Burning Chamber: 0.1M3-1.2 M3— — — — Mobile Incinerator, Requirement delivery containers, Easy to move/transport system— — — — Free Installment, Pre-installed heater, Suitable for camps— — — — Ultraviolet …

msw incinerator manufacturers

standard type, 11m long ,self supporting Capacity-220kgs/hr refuse-hospital waste average moisture-15-20% on fist time DIMENSIONS height: 2710mm length: 2840mm Width; 2450mm loading door opening: 610mm x 610mm Grate/Heath Area: 2.0(square meters) Primary chamber volume: 2.4(cubid  meters) secondary chamber volume :2,72(cubid meters0 total volume: 5,12(cubid meters) minimum stack diameter :560mm   300 kg per day healthcare …

pet animal cremation equipment

A chamber of post combustion of gases * A burner of combustion of gases, * A device of injection of air allowing a total recombustion of gases, * A device of air inlet of cooling of waste gases, * A sheath of evacuation of the gases burnt. * Carcass in strong sheet steel with support …

diesel oil fired medical waste incenerator

High Temperature Waste Incinerator Model D. MB 750XL Burn Rate-150Kg/hour minimum Weight(Kg)-4000kg Secondary Chamber (double chamber with post-burning) Gas Retention Time 2 second Fuel Diesel Power Supply for control box 220V-240, single phase 50-60Hz Minimum operating temperature 1200 oC One year spare parts package for complete maintainability 10m hose pipe. 1100 litre fuel Tank +pipe …

small home incinerators

Equipment Access Openings: Arrange all equipment and piping to allow access to openings without disassembly of equipment or piping. Provide space which permits full opening of all doors, panels, and other access openings.   Operating Space: Do not reduce or alter personnel working spaces shown except with prior approval of Resident Engineer.   Fuel Oil …

small incinarator

heavy Duty Steel casing   High Quality refectory lining & insulation   1 x Diesel fired ignition burners operated on / off   Front Loading Door (safety catch   Separate Ash removal Door     2.7  CONTROL UNIT   The entire processing cycle and the combined effect of the individual components of the incinerator shall …

manufacturer of ha zardous waste incinerator in china

Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz Per your advertisement for …

pet crematory

The temperature is over the minimum and under the maximum required temperature (e.g 1150?C) of the thermal reactor (partial load).   When switching off, only the solenoid valve for the fuel supply closes, the burner fan stays on to cool and protect the burner head.   The reactor burner shall be modulating burner with pre-ventilation …

burner manufacturers

1. SCOPE OF FEATURE The work specified in the agreement will certainly consist of. 1. Supply, place as well as assign a heater as given in the technological specifications 2. Specification for adherence to OSHA along with other legal demand associating with Health and wellness of staff members throughout execution of the works covered in …

medical incinerator producer

1. The double chamber incinerator shall ideally be made. Air supply in the primary and secondary chamber shall be controlled in between 30% -80% as well as 170% -120% of stoichiometric amount specifically. Circulation meter/suitable circulation measurement tool shall be supplied on the key and second air ducting. The combustion air shall be provided via …

laboratory heater

the entire carcass of animals (cattle, steeds, Sheep, pigs, and more), along with normally contaminated materials Products in the gas stove. ? Opening Doors – – – – the closure as well as additionally dependency automatic system, Which are dealt with from another area by the operator. ? made to work in long mode in …

hog incinerators

The purpose of the start-up burner is to ignite waste materials and to maintain the prescribed minimum temperature in the primary chamber. It shall be mounted in the lower part of the primary chamber.   The start-up burner shall function automatically when:-   –      Pre-heating is completed, or after reaching the adjustable minimum temperature in …

clinical incinerators

● Able to drop 25-30kg per hour ● Contain 2 chambers to ensure significant decline in exhaust ● Be capable of temperature degree in series of 800c to 1000c ● Low upkeep style ● Has to be Fuel ● Required greater than 15amp 220- 250V power ● kW Intake power use to be specified ● …

Secure Payments

We accepet Paypal payment online

Fixed Price after payment

The price is fixed after you payment

Delivery on EXW Factory Term

We delivery on EXW Factory Term. Shipping term is separated
Open chat