hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recordingOperating temperature: Incinerator /Primary Combustion ChamberPrimary Chamber: 900 – 1200 0C Type: continuous loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Material:External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shockSecondary Combustion Chamber:Type: horizontal/verticalTemperature: 1200- 1300 oCResidence time of gases : >2 secondsAsh Residue: <5% of original waste sizeAsh Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ashFlue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacityAuxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off deviceWaste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack):Type: Vertical typeheight:>7 meter’Material: Fireproof cast, stainless steelOUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste sizeReduction of Pollutant gas SO2, HCL, HF and line particulateEmission standard:WHO/ EuropeanTest report for emission testing provided?Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity).Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions)Power Requirement:220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed Length, width and height of incinerator, Area (length x width) for the floor (platform) and Length, width and height for roofing, for each type of incinerators to be installed Needs during the transport, installation, assembly, commissioning and operation of the equipment in terms of access points, available space to operate (inside and outside of the room), ways to get to the site where the equipment will be placed or any others. ; Technical Specifications (fuel consumption rate, weight, anchoring system, support points, etc.); Chimney specifications to be used for the roof design ( size, support needs, insulation); Considerations related to operation and Maintenance, for e.g., minimum available area to perform routine maintenance tasks and replacement of key parts that need to be changed more frequently; Any consideration/need of the incinerator while being operated that might impact the design of the room/shelter where it will be placed.Other important information to be considered that can influence or impact the designing and building processes of the infrastructure for the incinerators, for example area dimension for other accessary parts like fuel tanker storage, if applicable, etc…. Delivery time (DAP, Addis Ababa) in weeksName of manufacturer including website of the manufacturer &/ supplier & country of origin
What is the main advantage of incineration? Incineration plays a vital role in making waste management easier and more efficient. Incineration can burn up to 90% of the total waste generated and sometimes even more. However, landfills only allow organic decomposition without making much difference, and non-organic waste keeps accumulating. What materials can be incinerated? A material commonly associated with waste incineration is municipal solid waste (MSW). This type of waste is typically general waste such as household waste, food waste, cardboard, and paper. All of these are safe to incinerate. What are the types of waste? There are 5 types of waste, do you know them all? Liquid Waste. Liquid waste is commonly found both in households as well as in industries. … Solid Rubbish. Solid rubbish can include a variety of items found in your household along with commercial and industrial locations. … Organic Waste. … Recyclable Rubbish. … …