Category: Blog

medical incinerators in china

Would plant operations be operational on a basis of 24 hours per day, 7 days a week, all year long except for regular and preventive maintenance periods?   How many hours per year could your process be operational?   What would be your approach for larger projects aiming to valorize 1 000 tons per day? …

incinerators from china

An operating test should be conducted to ensure that all of the control components have been properly installed and that all parts of the incinerator, including controls and safety devices, are in satisfactory operating condition. The requirements for prepurge and time between restarts should be verified. The test should include but not limited to the …

pet cremation incinerators

The successful bidder shall deliver the incinerator skid in a container. The container will be emptied by CEB and returned to the successful bidder / or to its shipping agent. A containerized solution is also acceptable. Electrically operated 220 volt ( 60 Cycle – 1 phaze ) Able to complete burning material that turns to …

incineration combustion chamber

Supervision of installation of the new incinerator set shall be provided by the successful Bidder while labour and heavy duty equipment shall be provided by CEB.     ?     The successful Bidder shall submit to CEB, prior to shipment of the incinerator set, its procedures for the installation of the incinerator and exhaust chimney. This …

smart ash incinerator price

Flue Gas Cleaning   System   ? Wet Scrubber   ? Electrostatic precipitation in combination ( Optional: Rate to be   quoted separately)     7 Chimney Height 10m (minimum)       ?     Total duration of the supervision of installation, testing and commissioning works shall not exceed 2 weeks.     2.11       Commissioning   …

laboratory incinerator china manufacturer

Incinerator dual chamber with capacity 1.5 m3/batch or 6 m3/ day, digital thermocontrol range 0‐1200 C, thermocouple, air supply capacity 10m3/ minute, power consumption 1.2kWH/ hour, power 3 phase with netral, cooling water sprinkler capacity 5L/ minute, completed with refractory (insulation, castable, ceramic blanket) and PLC SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL …

animal incinerators china

Incinerate: medical waste and general waste Capacity to burn waste: 400-500kg/hr Fuel: Diesel Fuel Consumption: 10 liters/hr maximum Incineration temperature: 950-1300 degrees centigrade Casing: thick (min 5mm) stainless steel casing and fully insulated to withstand sea humidity Voltage 220/240v or 380/415V Frequency 50Hz Feeding: Automatic Ash/leftovers removal: Automatic Flue gas filtration system: Yes   Thus, …

animal crematorium equipment

I also research their product details and find it don’t require fuel and also not require fan blower but that incinerator can only burn waste with 30%-40% humid. I see if your products can burn waste with 30%-40% humid without fan blower and more 40% humid require fan (Optional solution) which lead us to kick …

Concerning Medical Waste

Medical waste is posing a growing problem all over the world, jeopardizing the health of staff, patients, disposal workers and anyone else coming into contact with the often hazardous materials discarded by hospitals and other healthcare sites. Hospital waste varies from site to site and the biggest challenge is to dispose of this wide range of waste streams. Incineration is still the preferred way to process medical waste without endangering the heath patients, staff or anyone else coming into contact with them. Clinical waste is costing more and more to dispose of safely. Health Clinics and Health center can now handle their own waste streams using one of our specialist medical incinerators. Destroying hazardous waste at source is by far the most effective and efficient way of handling waste that could potentially spread diseases or viruses. Requirement 20% -25% of the full waste created by medical treatment facilities is associated to as hazardous and also might develop a selection of health as well as environmental threats if not managed and also harmed in a correct means. HICLOVER is now offering a full range of medical waste incinerators, designed to provide efficient waste destruction, utilizing best available technologies and environmentally friendly process. Due to the secondary chamber with its 2 second retention period, our medical incinerator range is well suited to process medical waste. Our products make sure reliable, neat as well as very easy disposal of …

large scale incinerator

Programming controls. Programming controls should be verified as controlling and cycling the unit in the intended manner. Proper prepurge, ignition, postpurge, and modulation should be verified. A stopwatch should be used for verifying intervals of time. ?     Fuel supply controls. The satisfactory operation of the fuel control solenoid valves for all conditions of operation and …

incinerator burners

Fully automatic sequential control provided by internal PLC system providing control of: Secondary chamber pre-heat Burn cycle (variable) Cool down cycle Fuel Options Diesel, LPG, Natural or Bio Gas. Typical Fuel Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres per hour Natural Gas: 7 / 9 Nm3 per …

hospital incinerator manufacturers

The incinerator fuel tank shall meet the following requirements: a) The tank shall be installed above ground and according to all of the fuel tank requirements in Section 1015 including secondary containment. b) The tank shall be sized to hold a 14 day supply of diesel fuel   6) Manufacturer has to provide the following …

hazardous waste incinerators in china

Anchor all equipment to building floor or structure as shown or as recommended by manufacturer with allowance for thermal expansion as necessary.   Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 feet) of the floor and …

incinerator type of pyrolytic medical waste incinerator capacity

Including:Incinerator: Structure to be specified The mark to be specified Water temperature: 800 to 1000 ° C; Refractory Temperature of more than 1100 ° C + obtained; Capacity: 20-50 kg / hour Fireplace: 4 to 6 meters high; Dimension 70 cmx70 crn Height: 1.10 meters Fuel: coal; Aspiration: natural – A receiving cage for biomedical …

incinerator capacity calculation

Test shall be conducted by factory authorized representative of incinerator manufacturer.   Demonstrate required weight reduction of specified waste. Waste shall be fed in a single batch to the unit. After termination of manufacturer’s predicted burning period, inspect and weigh the residue.   Emissions testing may be deleted if not required by state or local …

incinerators manufacturers china

The incinerator shall then take supply from the DO tank through its DO feed pumps to its respective burners. An integrating meter shall be installed to measure the volume of DO consumed by the incinerator. Suitable pre metering strainers shall be provided together with a lockable by-pass across both strainer and meter. The meter shall …

Secure Payments

We accepet Paypal payment online

Fixed Price after payment

The price is fixed after you payment

Delivery on EXW Factory Term

We delivery on EXW Factory Term. Shipping term is separated
Open chat