Blog

STRONG WASTE BURNER

Primary chamber – Consists of a monolithic high grade refractory concrete with high grade insulation backing, . Utilising a refractory hearth or equivalent for continuous ash removal. Secondary Chamber – Consists of high density, low thermal mass refractory ceramic fibre with an innovative low emissivity protective coating. bio medical waste treatment plant ( Incineration )with …

infectious waste pyrolysis machine chinalarge animal incinerators

Major components are – Ethanol, Paraffin, Silicon, Aluminium chloro hydrate, Bentone ,LPG quote for incinerators for industrial chemical wastes treatment, 1 burning rate must be Average 30kgs/h 2 inside of chamber material must be refractory concrete cement 3 it works in three system diesel oil/ Natural gas or LPG 4 voltage must be 220V 5 …

low-cost medical waste incinerator

Stack: Type:  Wire Supported MOC:  Mild Steel of ISstd Height :3 Meters or more • PROCESS AT LEAST 1 METRIC TON OF WASTE PER DAY • OPERABLE BY 1 PERSON, WITH NO TRAINING REQUIRED • REGULAR MAINTENANCE CAN BE COMPLETED BY 1 PERSON WITH LIMITED TRAINING • REGULAR MAINTENANCE SHOULD NOT EXCEED 1-HOUR PER DAY …

dispose Medical waste IV

the incinerator can be made use of to do away with Clinical waste IV, used needles, utilized syringes, scalpels, made use of dressing product, private security gadgets like gown, gloves and so on truncated body components, excreta from clients and also various other research laboratory waste.incineration tools that can deal with a mix of clinical …

Top Feeding Door Solid Waste Incinerators HICLOVER

HICLOVER Top Feeding Door Waste Incinerators ▲▲▲Large Feeding Door ▲▲▲Better for Animal Waste Cremation ▲▲▲HICLOVER Brand Section ***Primary Combustion Chamber ***Secondary Combustion Chamber ***Smoke Filter Chamber ***Optional Wet Scrubber System(1 section or  3 sections) Phone: +86-13813931455(whatsapp/wechat)Website: http://www.hiclover.com/  Email: Email:    Nanjing Clover Medical Technology Co.,Ltd. Items Side Loading Door Top Loading Door Cost Cheap High cost Manufacture Tech. Easy A litter difficult …

WASTE BROCHURES In Addition To CONTAMINATED PRODUCTS LIST

1 Burner 30 =KG burn/h as well as also it need to have a Scrubber. 2 Heater ought to have Electric Plastic Shredder for reducing of glass container, surange of Drug. 3 Heater need to have Electric Auto Clave or Microwave for Dis Infection individually with burner. 4 Incinerator requires to have Double Chambers initially …

Medical Center Waste Monitoring

Hospital Waste Management as well as Competitive prices as Pakistan is a competitive market. We have a complete setup with Office, Customer Relations, Import / Export, Biomedical Department, Application Support Department & Project Designing Department.Description        Minimum Requirements Design standard    Multiple chamber incinerator to the design of EPA  standards, Air pollution control Description of the …

Burner for medical center waste monitoring

Heater for health care facility waste surveillance with the adhering to attributes: – – In high temperatures( pyrolytic burner 2 chambers with temperatures varying from 950 º C to 1320 º C; – – Capability to damage of 400 to 600kg per hr; – – Effective in ruining germs; – – Drain ash; – Drain …

Mobile Cremation Instruments

Layout CA-200 Picture Burning Rate Ordinary 100 kgs/hour Key Burning Chamber 2000 Liters Extra Burning Smokeshaft Yes Feed Setting Guidebook Voltage 220V Power 3.0 Kw Fuel Kind Diesel Oil Heater Italy Original Oil Use (Diesel Oil) Normal 53 kg/hour Inside Dimensions 230 x 100 x 90cm (key chamber) External Dimensions 290 x 200 x 170cm …

30kgs rate 60kgs feed oil and gas burner small waste incinerator

30kgs rate 60kgs feed oil and gas burner small waste incinerator for Afghanistan Machine Working mode Oil or Gas + Power Voltage 220V Oil consumption (lit/hour) Average 13.3lit/hour/chamber Gas consumption (NG) (m3/hour) 16.0 (m3/hour) (NG) Gas consumption (LPG) (m3/hour) 11.7 (m3/hour) (LPG) Burning rate Average 30kg/hour Feed mode Manual Primary Combustion chamber 360 Liters Secondary Combustion …

china incinerator manufacturer and exporter

Primary Combustion Chamber Waste Charging Door: Provided with refractory lining with sealing gaskets Ash Removed Door: Provided with refractory lining with sealing gaskets Outer Body MOC: Mild Steel, 5mm Primary Chamber: Stainless Steel Operating Temperature :800. ± 50◦C Insulation: Insulation Brick Heating Elements Type: Kanthal Al Grade Power Consumption: 75 KW ( Initial Load ) …

Plus Size Burning Rate : 150-200 kg/hr Strong Waste Devices Main as well as 2nd Combustion Chamber Burner

Items/Model TS500( PLC) Photo Principle Waste Incineration Therapy Melt Rate 150-200 kg/hour Control Setting PLC( Programmable Reasoning Controller Heater) Combustion Chamber 2700L Inside Dimensions 190x120x120cm Second Chamber 1300L Smoke Filter Chamber Yes Feed Setting Manual Voltage 220V Oil Intake (kg/hour) Common 28 Gas Use (m3/hour) *** Temperature Show Digital Show Temperature Level Safety And Security …

Device Measurement : Burning Rate : 60-80 kg/hr Pyrolytic Double Chamber Burner

Items/Model TS100( PLC) Image Concept Waste Incineration Treatment Shed Rate 60-80 kg/hour Control Setting PLC( Programmable Reasoning Controller Burner) Burning Chamber 1200L Inside Measurements 120x100x100cm Second Chamber 600L Smoke Filter Chamber Yes( Dry Scrubber) Feed Establishing Manual Voltage 220V Oil Usage (kg/hour) Common 20.4 Gas Consumption (m3/hour) *** Temperature Level Monitor Digital Existing Temperature Level …

Secure Payments

We accepet Paypal payment online

Fixed Price after payment

The price is fixed after you payment

Delivery on EXW Factory Term

We delivery on EXW Factory Term. Shipping term is separated